NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1
Item #: 244456188

NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1

Item #: 244456188

USD 56

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from TR

0 ratings Write a review
In stock
tr Imported from Turkey store

QTY:

This product is not Fulfilled by Ubuy and can take minimum 10 days in delivery. We might cancel the product from the order and refund you if any issue arise with the delivery of this product.
Our Top Logistics Partners
  • fedex
  • dhl
Show More
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment
Note: Step Up Voltage Transformer required for using electronics products of TURKEY store (230 V). Recommended power converters Buy Now.

Product Details

Shop NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1 online at a best price in Palau. 1795700203
  • NASA Work Breakdown Structure (WBS) Handbook NASA SP-2016-3404We print NASA handbooks and standards for the convenience of those that use them on a daily basis. We print all of these a full 8 ½ by 11 with large text so they are easy to read. Yes, color books are expensive to print so unless the information relies on the use of color for proper interpretation or understanding, we print most books in black and white to keep the cost down. All these documents are available for download for free from NASA, however printing them all over a network printer would take days.Why buy a book you can download free? We print this so you don't have to.All these books are available for free download from the government web site. Some are available only in electronic media. Some online docs are missing pages or barely legible. We at 4th Watch Publishing are former government employees, so we know how government employees actually use the standards. When a new standard is released, an engineer prints it out, punches holes and puts it in a 3-ring binder. While this is not a big deal for a 5 or 10-page document, many NIST documents are over 100 pages and printing a large document is a time- consuming effort. So, an engineer that’s paid $75 an hour is spending hours simply printing out the tools needed to do the job. That’s time that could be better spent doing engineering. We publish these documents so engineers can focus on what they were hired to do – engineering. It’s much more cost-effective to just order the latest version from If there is a standard you would like published, let us know. Our web site is usgovpub.comHere are other NASA titles we publish:NASA-STD-5001BStructural Design and Test Factors of Safety for Spaceflight Hardware NASA-STD-5006AGeneral Welding Requirements for Aerospace Materials NASA-STD-5008BProtective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support EquipmentNASA-STD-5009ANondestructive Evaluation Requirements for Fracture-Critical Metallic ComponentsNASA-STD-5012BStrength and Life Assessment Requirements for Liquid-Fueled Space Propulsion System EnginesNASA-STD-5019AFracture Control Requirements for Spaceflight HardwareNASA-STD-5005DStandard for The Design and Fabrication of Ground Support EquipmentNASA-HDBK-8739.21Workmanship Manual for Electrostatic Discharge ControlNASA-HDBK 8739.23ANASA Complex Electronics Handbook for Assurance ProfessionalsNASA-HDBK-8719.14 Handbook for Limiting Orbital DebrisNASA-HDBK-8709.22Safety and Mission Assurance Acronyms, Abbreviations, and DefinitionsNASA-HDBK-7009NASA Handbook for Models and Simulations: An Implementation Guide For NASA-STD-7009NASA-HDBK-8739.19-2Measuring and Test Equipment Specifications NASA Measurement Quality Assurance Handbook – Annex 2NASA-HDBK-8739.19-3Measurement Uncertainty Analysis Principles and Methods NASA Measurement Quality Assurance Handbook – Annex 3NASA-HDBK-8739.19-4Estimation and Evaluation of Measurement Decision Risk NASA Measurement Quality Assurance Handbook – Annex 4NASA RCMReliability-Centered Maintenance Guide for Facilities and Collateral Equipment Daha fazla göster
YayıncıIndependently published
Yayınlanma Tarihi2 Şubat 2019
Dilİngilizce
ISBN-101795700203
ISBN-13978-1795700207
Boyutlar21.59 x 0.43 x 27.94 cm

Product Description

NASA Work Breakdown Structure (WBS) Handbook: NASA SP-2016-3404 Rev.1

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop NASA Work Breakdown Structure (WBS) Handbook: NASA Online From Ubuy?

    Answer: It’s easy to shop NASA Work Breakdown Structure (WBS) Handbook: NASA online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is NASA Work Breakdown Structure (WBS) Handbook: NASA Available to Shop Online in Palau?

    Answer: Yes, at Ubuy Palau this product is available for you to shop at a reasonable price. The NASA Work Breakdown Structure (WBS) Handbook: NASA is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

İngilizce Baskı NASA Format: Kağıt Kapak Editorial Review

No editorial reviews found

Customer Reviews & Ratings

5.0
2 customers ratings
  • 5 Star
    100%
  • 4 Star
    0%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Platform Trust & Buyer Confidence

trustpilot logo
4.2/5 9791 reviews
Read reviews
BS
Beat
Verified buyer

“Simple process, tax and import duties announced by email. Paid online. Delivery was quick. Can recommend.”

22 October 2026 · via Trustpilot
S
Songpon
Verified buyer

“The product met my expectations perfectly. The ordering process was convenient and easy, and I was kept updated on the delivery status throughout the shipping process. The delivery was also very fast. I can confidently confirm that Ubuy provides an excellent shopping and delivery experience. Highly recommended! From Thailand”

22 October 2026 · via Trustpilot
D
Dimitra
Verified buyer

“Quick and efficient delivery and the possibility to get the package delivered from a pick-up point. I'm very happy with my experience and would recommend it again!”

22 October 2026 · via Trustpilot
HJ
Heer
Verified buyer

“My product came in good condition from the USA. I was happy that I could buy via this Chanel and that DHL brought it to my house. The communication is fine. The charger works very well. Fast and my Samsung watch and Samsung airbuds and Samsung Fold 8 Ultra all charge fast.”

22 October 2026 · via Trustpilot
SF
Sergey
Verified buyer

“Hello Ubuy team, thank you so much for the excellent service! I received the package today; it arrived in great condition and was packed very neatly. The delivery was fast, and the courier was very friendly as well. Wishing continued success to Ubuy and the entire team!”

23 October 2026 · via Trustpilot

WHY SHOP WITH US

Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.